Introduction
This area covers Cambridge, and the Group will have the opportunity to discuss the proposed two new railway tracks to be constructed to join the four existing tracks at the new Cambridge South station and continue into Cambridge station. Plans at Cambridge station include a new platform, bridges and building upgrades. We will also discuss the plans to demolish and replace the overbridge at Long Road and making safety improvements to the level crossing at Laundry Lane. At Cherry Hinton, the new turnback facility will be explored, as will the reconstruction of the two footbridges at Coldham’s Common and The Tins footpath to allow for electrification of the railway and the addition of a second track.
List of parishes/wards
-
Parish and Ward Membership List - Cambridge